ITP’s FlameOut Breathe flame-retardant breather membrane has been specified for the multi-million-pound redevelopment of the Stephenson building at Newcastle University. Built in the 1940s, Stephenson Building has a long history of training engineers. It is well known as a highly visible gateway to the University’s engineering quarter. International architecture and engineering practice, NORR, have led the design of a project which is harnessing the building’s 70 years of heritage and transforming it into a hub for the future, creating a facility for the 21st century and beyond. The original footprint is home to a new 18,000 m2 cutting-edge building providing extensive space for education, research, innovation and industrial collaboration. Bowmer + Kirkland was appointed as the main contractor to oversee the project over two phases between September 2023 and autumn 2024. The rear of the building was demolished to make way for new-build space and the front has been retained to minimise demolition and reduce the carbon footprint. The original building's teaching and office spaces are also being renovated. Providing high breathability to facilitate the release of water vapour and protect the condition of the building envelope, its advanced membrane technology combines W1-rated water tightness with a B-s1,d0 fire safety rating which is independently tested to EN 13501-1.
© Copyright 2024. All Rights Reserved by L2 Architectural Media Ltd. | Designed by Doors Off Web Design